Mid Manair Dam :
Mid Manair Dam also known as MMD is a major irrigation project under construction across the Manair River, at Manwada Village, Boinpally Mandal, Karimnagar District, Telangana.
This Reservoir initiated as part of Sriram Sagar stage-II which the foundation stone was laid by the former Prime Minister P. V. Narasimha Rao in 1991.
The surplus water from Sriram Sagar Project flow though SRSP Flood Flow Canal (SRSP FFC) into Mid Manair Dam apart from Manair River water.
Once the dam reached to full capacity, water can be released into Lower Manair Dam, a major balancing reservoir at Karimnagar city with 24Tmcft Gross Capacity.
Dam construction was started in 2004-05 as part of Jalayagnam, but was delayed due to the several political reasons.
And there is huge delay in fair compensation and suitable rehabilitation to the oustees of the Mid Manair Reservoir.
The oustees are Still looking for the justice from govt.
130 km long Flood Flow Canal construction work was completed till Mid Manair Dam.
As Dam is under construction, the released water from Flood Flow Canal head regulator would fill Lower Manair Dam currently.
Mid Manair Dam also known as MMD is a major irrigation project under construction across the Manair River, at Manwada Village, Boinpally Mandal, Karimnagar District, Telangana.
This Reservoir initiated as part of Sriram Sagar stage-II which the foundation stone was laid by the former Prime Minister P. V. Narasimha Rao in 1991.
The surplus water from Sriram Sagar Project flow though SRSP Flood Flow Canal (SRSP FFC) into Mid Manair Dam apart from Manair River water.
Once the dam reached to full capacity, water can be released into Lower Manair Dam, a major balancing reservoir at Karimnagar city with 24Tmcft Gross Capacity.
Dam construction was started in 2004-05 as part of Jalayagnam, but was delayed due to the several political reasons.
And there is huge delay in fair compensation and suitable rehabilitation to the oustees of the Mid Manair Reservoir.
The oustees are Still looking for the justice from govt.
130 km long Flood Flow Canal construction work was completed till Mid Manair Dam.
As Dam is under construction, the released water from Flood Flow Canal head regulator would fill Lower Manair Dam currently.