About Us
1.History:
South Central Railway was formed on 02-10-1966 when Hubli and Vijayawada Divisions of Southern Railway and Sholapur and Secunderabad Divisions of Central Railway were carved out and merged into a new Zone. Subsequently, Guntakal Division of Southern Railway was merged with South Central Railway on 02-10-1977 and Sholapur Division was remerged with Central Railway. Secunderabad Division was split into two Divisions viz. Secunderabad and Hyderabad on 17-02-1978. Following reorganisation of zones and Divisions with effect from 01-04-2003, two new Divisions viz., Guntur and Nanded were operationalised duly transferring Hubli Division to newly formed South Western Railway.
Presently S.C. Railway has 6 Divisions, viz, Secunderabad, Hyderabad, Vijayawada, Guntakal, Guntur and Nanded. South Central Railway predominantly serves the state of Andhra Pradesh and Maharashtra and to a limited extent, portions of Karnataka, Tamilnadu & Madhya Pradesh states.
2.Profile:
1.
Number of Divisions
06
2.
Number of States covered
05
3.
Number of stations
689
4.
Originating Earnings 2013-14 (Rs in crores)
10616.12
5.
Apportioned Earnings 2013-14 (Rs in crores)
12980.04
6.
No. of Originating Passengers 2013-14 (in millions)
386.100
7.
Originating Loading 2013-14 (in million Tonnes)
107.240
8.
Operating Ratio 2013-14
83.87
9.
Number of passenger Trains run daily:
Mail / Express trains
Passenger Trains
MMTS Trains
709
241
350
118
10.
Staff Strength
Sanctions
Actual
1,02,078
88,575
3.State-wise Route Kilometerage:
State
BG
MG
Total
Andhra Pradesh
4403.892
0
4403.892
Maharashtra
996.945
105.750
1102.695
Karnataka
286.690
0
286.690
Madhya Pradesh
0
70.180
70.180
Tamilnadu
6.860
0
6.860
Total
5676.387
175.930
5852.317
4.Division-wise Route & Running Kilometerage:
Division
BG
MG
Total
Route
Running
Route
Running
Route
Running
Secunderabad
1332.683
2091.404
--
--
1332.683
2091.404
Vijayawada
958.926
1626.431
--
--
958.926
1626.431
Guntakal
1354.151
1989.057
--
--
1354.151
1989.057
Guntur
627.840
652.316
-
--
627.840
659.316
Hyderabad
592.922
622.008
--
--
592.922
622.008
Nanded
809.865
809.615
175.930
175.930
985.795
985.545
Total
5676.387
7797.831
175.930
175.930
5852.317
7973.761
5. Electrified Lines:
S.No.
Division
Route
Route Km.
Track Km.
1
Vijayawada
Vijayawada-Gudur
326
941
2
Vijayawada-Visakhapatnam
357
925
3
Vijayawada-Kondapalli
18
62
Total
701
1928
4
Secunderabad
Kondapalli-Ballarshah
714
1609
5
Kazipet-Hyderabad-Sanatnagar
173
459
6
Sanatnagar-Vikarabad-Tandur-seram-Malkhaid Road-Wadi (Excl)
177
458
Total
1064
2526
7
Guntakal
Gudur-Tirupati
94
268
8
Renigunta-Nanadlur-Bakrapet-Kadapa-Kamalapuram (incl. Balapalle-Pullampet 2nd line)-Muddanuru-Tadipatri-Vemulapadu-Jakkalacheruvu-Gooty-Guntakal
333
887
9
Tirupati-Pakala-Katpadi
104
122
Total
531
1277
10
Guntur
Krishna Canal-Guntur-Tenali-Nallapadu
57
141
Total
57
141
11
Hyderabad
Secunderabad-Falaknuma
16
41
12
Sitaphalmandi – Moula-Ali
9
13
Total
25
54
Grand Total
2378
5926
6.Major Establishments:
Establishment
No
Location
Zonal Headquarter
1
Secunderabad
Divisional Headquarters
6
Secunderabad, Hyderabad, Vijayawada, Guntur, Guntakal, Nanded
Workshops
5
Lallaguda (3), Tirupati, Rayanapadu
Diesel Loco Sheds
5
Kazipet, Gooty, Guntakal, Moula-ali, Vijayawada
Electric Loco Sheds
3
Secunderabad, Kazipet, Vijayawada
Training Institutes
30
Secunderabad, Kazipet, Vijayawada, Guntakal, Gooty, Washim, etc.
Hospitals
5
Lalaguda (300 beds), Vijayawada (203 beds), Guntakal (131 Beds), Rayanpadu (25 beds), Nanded (30 Beds) Total: 689 beds
Health Units
44
Secunderabad Division (9),
Vijayawada Division (11),
Hyderabad Division (5), Guntakal Division (10), Guntur Division (4), Nanded Division (5)
Schools/ Colleges
14/5
Schools (14), Junior Colleges (4) ,
Degree College (1)
1.History:
South Central Railway was formed on 02-10-1966 when Hubli and Vijayawada Divisions of Southern Railway and Sholapur and Secunderabad Divisions of Central Railway were carved out and merged into a new Zone. Subsequently, Guntakal Division of Southern Railway was merged with South Central Railway on 02-10-1977 and Sholapur Division was remerged with Central Railway. Secunderabad Division was split into two Divisions viz. Secunderabad and Hyderabad on 17-02-1978. Following reorganisation of zones and Divisions with effect from 01-04-2003, two new Divisions viz., Guntur and Nanded were operationalised duly transferring Hubli Division to newly formed South Western Railway.
Presently S.C. Railway has 6 Divisions, viz, Secunderabad, Hyderabad, Vijayawada, Guntakal, Guntur and Nanded. South Central Railway predominantly serves the state of Andhra Pradesh and Maharashtra and to a limited extent, portions of Karnataka, Tamilnadu & Madhya Pradesh states.
2.Profile:
1.
Number of Divisions
06
2.
Number of States covered
05
3.
Number of stations
689
4.
Originating Earnings 2013-14 (Rs in crores)
10616.12
5.
Apportioned Earnings 2013-14 (Rs in crores)
12980.04
6.
No. of Originating Passengers 2013-14 (in millions)
386.100
7.
Originating Loading 2013-14 (in million Tonnes)
107.240
8.
Operating Ratio 2013-14
83.87
9.
Number of passenger Trains run daily:
Mail / Express trains
Passenger Trains
MMTS Trains
709
241
350
118
10.
Staff Strength
Sanctions
Actual
1,02,078
88,575
3.State-wise Route Kilometerage:
State
BG
MG
Total
Andhra Pradesh
4403.892
0
4403.892
Maharashtra
996.945
105.750
1102.695
Karnataka
286.690
0
286.690
Madhya Pradesh
0
70.180
70.180
Tamilnadu
6.860
0
6.860
Total
5676.387
175.930
5852.317
4.Division-wise Route & Running Kilometerage:
Division
BG
MG
Total
Route
Running
Route
Running
Route
Running
Secunderabad
1332.683
2091.404
--
--
1332.683
2091.404
Vijayawada
958.926
1626.431
--
--
958.926
1626.431
Guntakal
1354.151
1989.057
--
--
1354.151
1989.057
Guntur
627.840
652.316
-
--
627.840
659.316
Hyderabad
592.922
622.008
--
--
592.922
622.008
Nanded
809.865
809.615
175.930
175.930
985.795
985.545
Total
5676.387
7797.831
175.930
175.930
5852.317
7973.761
5. Electrified Lines:
S.No.
Division
Route
Route Km.
Track Km.
1
Vijayawada
Vijayawada-Gudur
326
941
2
Vijayawada-Visakhapatnam
357
925
3
Vijayawada-Kondapalli
18
62
Total
701
1928
4
Secunderabad
Kondapalli-Ballarshah
714
1609
5
Kazipet-Hyderabad-Sanatnagar
173
459
6
Sanatnagar-Vikarabad-Tandur-seram-Malkhaid Road-Wadi (Excl)
177
458
Total
1064
2526
7
Guntakal
Gudur-Tirupati
94
268
8
Renigunta-Nanadlur-Bakrapet-Kadapa-Kamalapuram (incl. Balapalle-Pullampet 2nd line)-Muddanuru-Tadipatri-Vemulapadu-Jakkalacheruvu-Gooty-Guntakal
333
887
9
Tirupati-Pakala-Katpadi
104
122
Total
531
1277
10
Guntur
Krishna Canal-Guntur-Tenali-Nallapadu
57
141
Total
57
141
11
Hyderabad
Secunderabad-Falaknuma
16
41
12
Sitaphalmandi – Moula-Ali
9
13
Total
25
54
Grand Total
2378
5926
6.Major Establishments:
Establishment
No
Location
Zonal Headquarter
1
Secunderabad
Divisional Headquarters
6
Secunderabad, Hyderabad, Vijayawada, Guntur, Guntakal, Nanded
Workshops
5
Lallaguda (3), Tirupati, Rayanapadu
Diesel Loco Sheds
5
Kazipet, Gooty, Guntakal, Moula-ali, Vijayawada
Electric Loco Sheds
3
Secunderabad, Kazipet, Vijayawada
Training Institutes
30
Secunderabad, Kazipet, Vijayawada, Guntakal, Gooty, Washim, etc.
Hospitals
5
Lalaguda (300 beds), Vijayawada (203 beds), Guntakal (131 Beds), Rayanpadu (25 beds), Nanded (30 Beds) Total: 689 beds
Health Units
44
Secunderabad Division (9),
Vijayawada Division (11),
Hyderabad Division (5), Guntakal Division (10), Guntur Division (4), Nanded Division (5)
Schools/ Colleges
14/5
Schools (14), Junior Colleges (4) ,
Degree College (1)
0 comments:
Post a Comment