The Data Link II communications technology for the P-8I was received by Boeing from Bharat Electronics Limited in April 2010. The communications system will enable exchange of tactical data and messages between Indian Navy aircraft, ships and shore establishments. Boeing will install the system during P-8I final assembly.[69][70] The IFF, system from BEL was also handed over to Boeing for integration with P-8I in December 2010.[71] India buying AGM-84L Harpoon Block II Missiles and Mk 54 All-Up-Round Lightweight Torpedoes for the P-8I.[72]
Flight testing of P-8Is began in July 2012,[73] with deliveries planned to start in 2013.[68][74] The first P-8I was handed over to an Indian naval team at the Boeing facility at Seattle on 19 December 2012.[75][76] The Indian Navy is to fly it to India along with the second and third aircraft after they are handed over in May and June 2013.[75] The Indian Navy inducted its first Boeing P-8I Poseidon aircraft on 15 May 2013.[77] It received a second P-8I on 16 November 2013.[78][79] The aircraft are based at INS Rajali, in Tamil Nadu.
0 comments:
Post a Comment