Home » » DMW

DMW

DMW was set up in 1981 with the assistance of World Bank. At that time Industries in India were not fully developed to manufacture diesel engine precision components to carry out the remanufacturing of various traction machines & engine blocks. DMW started the components manufacturing in 1986 along with the remanufacturing of traction machines & engine blocks. Need was also felt for rebuilding of locomotives to enhance performance of locomotives by incorporating latest technological upgradations and all RDSO modifications. It was expected that with the rebuilding of locos after 18 years, the locos would become fuel efficient, shall haul heavier loads and shall be fitted with latest modern less maintenance intensive sub-assemblies and assemblies. Accordingly the rebuilding was started in DMW in 1989. The shops which were set up for component manufacturing and remanufacturing of traction machines and engine blocks are under Phase-I of the project. The major shops in Phase-I are:

Shops set up under Phase-I of the project are called manufacturing shops
Light Machine Shop
Heat Treatment Shop
Traction Machine Shop
Heavy Machine Shop
Cylinder Liner Shop
Carbon Brush Shop
Plant Maintenance Shops

Tool Room, Main Receiving Station and other support facilities
Shops which came up in Phase-II i.e. when the facilities were being created for rebuilding of locomotives are under Phase-II and the shops are:

Shops set up under Phase-II of the project are called Rebuilding shops
Loco Rebuilding Shop
Power Pack Shop
Bogie Shop
Transmission Repair Shop
Air Brake & Pipe Shop
Loco Test & Paint Facilities
Share this article :

0 comments:

Post a Comment

 
Support : Mana Illu | Recipe Table | LLM Projects
Copyright © 2013-15. AP Heritage - All Rights Reserved
Template Created by Creating Website Published by Mas Template
Proudly powered by Blogger